If your optimization model reports "infeasible", or runs for hours without closing the gap, the solver usually isn't the problem: the formulation is. A rule that contradicts another, a "big M" that's too large, or a model that's correct but weak can each stop a good solver cold. Finding which one is most of the work, and it's work I've done on scheduling, loading, routing and other combinatorial models.
Why models fail
- Infeasible: two or more constraints can't all hold at once. Often it's a data problem (a due date before the parts arrive) or a rule written stricter than the business really needs.
- Too slow: the model is valid but gives the solver little to work with: loose bounds, big-M constraints, many equivalent (symmetric) solutions, or a size that grows faster than the data.
- Wrong answers: it solves, but the plan breaks a rule nobody wrote down.
Ways to fix it
| What it does | Good for | Limits | |
|---|---|---|---|
| Solver settings and time limits | Tune parameters, accept a "good enough" gap | Models that are almost fast enough | Doesn't fix a weak formulation |
| Find the conflicting rules | The solver's conflict analysis (an irreducible infeasible set), or soft constraints with penalties that show which rules break | "Infeasible" with no clue why | You still decide which rule gives way |
| Reformulate | Tighter constraints, fewer big-Ms, symmetry breaking, a different modeling approach (e.g., constraint programming for scheduling) | Slow but valid models | Needs modeling experience |
| Decompose or combine methods | Split the problem, or use a heuristic around an exact solver | Large real instances | More code to maintain |
What I've worked with
Mixed-integer models in OR-Tools, CPLEX and Gurobi; Pyomo and PuLP formulations; constraint programming for scheduling; metaheuristics (simulated annealing, tabu search, genetic algorithms) when an exact solver can't scale; and hybrids of the two. The scheduler behind my factory case plans 746 tasks across 8 bays and 26 workers.
What I need from you
The model (code or a written description), a data instance that shows the problem, and what "infeasible" or "too slow" means for you (how long it may run, how good the answer must be).